IMPORTANT QUESTION FROM TIME AND WORK
A can complete a piece of work in 4 days. B takes double the time taken by A, C takes double that of B, and D takes double that of C to complete the same task. They are paired in groups of two each. One pair takes two-third the time needed by the second pair to complete the work. Which is the first pair?
A) A, B
B) B, C
C) A, C
D) A, D
A) A, B
B) B, C
C) A, C
D) A, D
Four men and three women can do a job in 6 days. When 5 men and 6 women work on the same job, the work gets completed in 4 days. How long will 2 women and 3 men take to do the job?
A) 18 days
B) 10 days
C) 8.3 days
D) 12 days
A) 18 days
B) 10 days
C) 8.3 days
D) 12 days
Ram completes 60% of the task in 15 days and then takes the help of Rahim and Rachel. Rahim is 50% as efficient as Ram is and Rachel is 50% as efficient as Rahim is. In how many more days will they complete the work?
A) 121/3
B) 51/7
C) 40/7
D) 65/7
A) 121/3
B) 51/7
C) 40/7
D) 65/7
Three machines P, Q and R. working together, can do a job in x hours. When working alone, P needs an additional 6 hours to do the job; Q, one additional hour; and R, x additional hours. The value of x is
A) 2/3
B) 11/12
C) 3/2
D) 2
A) 2/3
B) 11/12
C) 3/2
D) 2
There's a lot of work in preparing a birthday dinner. Even after the turkey is in oven, there are still the potatoes and gravy, yams, salad, and cranberries, not to mention setting the table. Three friends, Asit, Arnold, and Afzal, work together to get all of these chores done. The time it takes them to do the work together is six hours less than Asit would have taken working alone, one hour less than Arnold would have taken, and half the time Afzal would have taken working alone. How long did it take them to do these chores working together?
A) 20 minutes
B) 30 minutes
C)40 minutes
D) 50 minutes
A) 20 minutes
B) 30 minutes
C)40 minutes
D) 50 minutes
Three small pumps and one large pump are filling a tank. Each of the three small pumps works at 2/3rd the rate of the large pump. If all 4 pumps work at the same time, then they should fill the tank in what fraction of time that it would have taken the large pump alone?
A) \( \frac{4}{7} \)
B) \( \frac{1}{3} \)
C) \( \frac{2}{3} \)
D) \( \frac{3}{4} \)
A) \( \frac{4}{7} \)
B) \( \frac{1}{3} \)
C) \( \frac{2}{3} \)
D) \( \frac{3}{4} \)
A company has a job to prepare certain number cans and there are three machines A, B and C for this job. A can complete the job in 3 days, B can complete the job in 4 days, and C can complete the job in 6 days. How many days will the company take to complete the job if all the machines are used simultaneously?
A) 4 days
B) 4/3 days
C) 3 days
D) 12 days
A) 4 days
B) 4/3 days
C) 3 days
D) 12 days